150KW SOLAR SINGLE AXIS TRACKER SOLUTION FOR BALAJI GINNING, NANDURA
Chirayu power has installed 150kw of solar power single axis tracker system for Balaji Ginning and Pressing Industry, Nandura, District Buldhana, Maharashtra. This is the first solar tracker system of Vidarbha region of Maharashtra State.
This tracker system help solar panels tracks the sun. The solar panels rotate from East to West as per the motion of the Sun! This sun tracking / solar tracking helps in generation of around 25% more electricity from the solar system.
This solar system is designed to generation 1650 units / kw / Year i.e. an annual generation of 2,47,500 units (kWh). In the limited available ground, this technology helps in generation more energy. Description of system is as follows:
Solar Panels Used: Waaree Energies Polycrystalline panels
Inverter: Israel Technologies SolarEdge Optimization inverter.
Tracker System: German Technology
Structure and other system: Chirayu Power Designed
Year of Installation: 2018