fbpx
  • Office timing: 10AM to 7PM (Except holidays)

150KW Solar Tracker Solution for Balaji Ginning Industry, Nandura

150KW SOLAR SINGLE AXIS TRACKER SOLUTION FOR BALAJI GINNING, NANDURA

Chirayu power has installed 150kw of solar power single axis tracker system for Balaji Ginning and Pressing Industry, Nandura, District Buldhana, Maharashtra. This is the first solar tracker system of Vidarbha region of Maharashtra State.

This tracker system help solar panels tracks the sun. The solar panels rotate from East to West as per the motion of the Sun! This sun tracking / solar tracking helps in generation of around 25% more electricity from the solar system.

This solar system is designed to generation 1650 units / kw / Year i.e. an annual generation of 2,47,500 units (kWh). In the limited available ground, this technology helps in generation more energy. Description of system is as follows:

Solar Panels Used: Waaree Energies Polycrystalline panels

Inverter: Israel Technologies SolarEdge Optimization inverter.

Tracker System: German Technology

Structure and other system: Chirayu Power Designed

Year of Installation: 2018

Summary
150KW SOLAR SINGLE AXIS TRACKER SOLUTION FOR BALAJI GINNING, NANDURA
Article Name
150KW SOLAR SINGLE AXIS TRACKER SOLUTION FOR BALAJI GINNING, NANDURA
Description
Chirayu power has installed 150kw of solar power single axis tracker system for Balaji Ginning and Pressing Industry, Nandura, District Buldhana, Maharashtra. This is the first solar tracker system of Vidarbha region of Maharashtra State.
Author
Publisher Name
Chirayu Power Pvt. Ltd.
Publisher Logo