Introduction:

In the middle of Buldhana, Maharashtra, you'll find the Baheti Ginning Factory, a place that shows how good business ideas can make a difference. Mr. Govind Ji Baheti, who's successful in cotton, education, and oil processing, is in charge. Recently, he made things even better by putting up a new solar power plant that can make 1400KWh (units) of electricity in Malkapur. This is a big deal because it shows Mr. Baheti cares about the environment and wants to use clean energy for his factory in Maharashtra.

Client Overview:

Client Name: Shri Govind Ji Baheti
Address: Birla Rd, Vishnuwadi, Malkapur, Maharashtra 443101
Project Overview:
Project Name: 280Kw Solar System for Baheti Ginning Factory, Malkapur
Project Size: 280 Kw solar power plant
Solar Panels Used: Trina 500Wp- Mono + PERC + Half Cut Cells Panels
Inverters Used: SolarEdge Optimization Inverter
Structure Type: Aluminium mono-rail structure over galvanized shade (tin shade)
Accessories Provided: Remote Monitoring, FRP Walkway, Safety Railing, Chemical Earthing, stair case, ladder and LA set
Date of Installation: 20 Dec 2021
Yearly Electricity Generation: 4,20,000 kWh (units)
Yearly Revenue Achieved: INR 37,80,000/-

    Challenges Faced:

Optimizing Space Utilization:
The client, "Baheti Ginning," had their tin shade constructed on-site as per their convenience. Our engineers encountered the challenge of designing and installing a solar system that wouldn't disrupt the ongoing activities at the site. Simultaneously, the system had to be aesthetically pleasing, seamlessly blending with the surroundings.
Solution: Our dedicated team of civil engineers worked diligently to offer the optimal solution for our client. They devised an innovative design for a tilted tin shed structure, conducting a comprehensive shadow analysis to maximize energy production within the limited space available.

Adapting to Local Conditions:
The factory in the Vidarbha region faces the challenge of managing significant temperature fluctuations, which impact the generation of the solar system, due to its location in the region.
Chirayu Power proposed using MONO + PERC + Half Cut cell panels to mitigate temperature changes. The solution, tailored to the region's needs, included Trina 500Wp high-efficiency solar panels and safety features for optimal performance and durability in local climate conditions.

Solution Offered:
Chirayu Power is dedicated to providing clients with top-notch technical solutions that align with both technical and economic factors. our teams are dedicated to continuous improvement, enhancing system efficiency, enhancing customer satisfaction, and refining after-sales services, introducing their High-Efficiency Solar Panels.
Trina 500Wp- Mono + PERC + Half Cut Cells Panels chosen for exceptional efficiency.
Result: Optimal energy production, maximizing the project's sustainability.
Advanced Inverters:
SolarEdge Optimization Inverters deployed for enhanced system performance.
Result: Real-time monitoring capabilities for efficient maintenance and operation.
Customized Structure Design:
Tin Shed Tiled Structure designed for efficient space utilization.
Result: Robust foundation supporting the solar panels while optimizing available space.
Integrated Accessories:
Remote Monitoring, FRP Walkway, Safety Railing, Chemical Earthing, and LA incorporated.
Result: Ensured safety, longevity, and efficient operation of the solar energy system.
Results and Outcomes:
Chirayu Power and Baheti Ginning Factory collaborated to generate 420,000 kWh of electricity annually and achieve INR 4,200,000 in revenue. The successful 280KW solar system not only increased Baheti Ginning Factory's energy independence but also aligned with Chirayu Power's sustainability mission.

Client Testimonial: "We are highly satisfied with the solar solution provided by Chirayu Power. Their expertise, dedication to excellence, and forward-thinking approach have empowered us to adopt sustainable energy practices, enhancing both our operational efficiency and environmental consciousness."- Shri Govind Ji Baheti.”

Summary
280KW SOLAR SYSTEM FOR BAHETI GINNING FACTORY, MALKAPUR
Article Name
280KW SOLAR SYSTEM FOR BAHETI GINNING FACTORY, MALKAPUR
Description
Biggest Solar Rooftop Power plant under Net-Metering policy of Maharashtra for Chanvim Plastics, Nagpur
Author
Publisher Name
Chirayu Power
Publisher Logo