450KW Solar Project for Om Ginning and Pressing, Murtizapur
Client: Om Ginning and Pressing
Location: Vatori Road, Murtizapur, Akola, Maharashtra
Client’s Representative: Mr. Kailasji Agrawal
Project Overview:
Om Ginning and Pressing, located in Murtizapur, Akola, is a major player in the ginning and pressing industry. In 2016, when the solar industry was still emerging, Chirayu Power Pvt. Ltd. successfully installed a 200 kW solar system for Om Ginning and Pressing, becoming one of the first companies to provide industrial-scale solar solutions in the region.
Due to the successful performance of the initial system, Om Ginning and Pressing approached Chirayu Power again for their 450 kW solar expansion project, this time incorporating advanced technology for enhanced efficiency.
Total Installed Capacity: 450 kW
1. Panels:
- RES Solar 330 Wp Polycrystalline (for 200 kW system)
- Canadian Solar 450 Wp Half-Cut Panels (for 250 kW system)
2. Inverters:
- SMA 50 kVA x 4 Inverters (for 200 kW system)
- Growatt String Inverters (for 250 kW system)
3. Power Optimizer: S-1200
Project Summary:
The partnership between Om Ginning and Pressing and Chirayu Power Pvt. Ltd. began in 2016 with the installation of a 200 kW solar system, marking one of the first industrial solar projects in Akola district. This installation featured RES Solar 330 Wp polycrystalline panels and SMA 50 kVA inverters. Chirayu Power won this project based on its technical expertise, beating out many other solar vendors in the region.
After the system performed exceptionally well for 2.5 years, Om Ginning and Pressing reached out to Chirayu Power to install an additional 250 kW system. For the second installation, Canadian Solar 450 Wp half-cut panels and Growatt String Inverters were selected, offering higher efficiency and performance.
Both installations were equipped with FRP walkways, MS-coated railings, heavy stairs, safety lines, and auto water cleaning systems, ensuring that maintenance was safe and efficient.
Key Features of the Solar Solution
1. Mounting Structure:
- Anodized aluminum short rail structure with EPDM sheet for waterproofing, installed using rivets and self-drilling screws for durability and performance.
2. Walkway:
- FRP material used for the walkway, offering high weather resistance, shockproof properties, and lightweight design.
3. Railing Protection:
- MS-coated railings provided around the shed for the safety of cleaning and maintenance staff.
4. Earthing Kit:
- Pipe-in-pipe chemical earthing system with discom-approved earthing powder and copper plates for safety.
5. Lightning Protection:
- ESE Lightning Arrestor with a 107m protection radius and copper arrestors for effective lightning protection.
6. Cabling:
- TUV-certified cables for both AC and DC connections, ensuring high performance and protection against weather conditions.
7. Monitoring System:
- Module-level monitoring via SolarEdge optimizers and Growatt String Inverters, providing real-time performance tracking.
Expected Generation and Benefits of the Solar Project
The 450 kW solar system provides multiple benefits for Om Ginning and Pressing:
- Energy Cost Savings: The system has led to significant savings on electricity costs each year.
- Environmental Sustainability: The shift to solar energy reduces the company’s carbon footprint, contributing to environmental conservation.
- Reliable Power Supply: The solar system provides consistent and reliable energy generation, improving operational efficiency and reducing dependency on the grid.
- Carbon Footprint Offset: The 450 kW system is equivalent to planting approximately 6,750 trees (450 kW * 15 trees per 1 kW), supporting global sustainability.
Performance and Savings
For the past several years, Chirayu Power Pvt. Ltd. has successfully operated the 450 kW system (combined capacity of 200 kW and 250 kW) at Om Ginning and Pressing, generating approximately 5.7 lakh units per year.
- Annual Savings: The system has saved the company approximately ₹5 Lakh per year on electricity costs.
Conclusion
The successful installation and ongoing operation of the 450 kW solar system at Om Ginning and Pressing marks a significant step in their journey toward sustainable energy. With SolarEdge technology, high-efficiency panels, and Growatt inverters, Chirayu Power Pvt. Ltd. delivered a high-performance solar solution that meets the company’s energy needs while reducing operational costs.
For more information or to discuss how we can help your business transition to solar energy, contact us at Chirayu Power Pvt. Ltd. today!
This project showcases the impact of solar energy in industrial applications, demonstrating long-term cost savings and environmental benefits for Om Ginning and Pressing.
Performance Recap:
The solar system at Om Ginning and Pressing has been generating 5.7 lakh units annually, delivering annual savings of ₹5 Lakh, making it one of the top industrial solar solutions in the Akola district.
For further details about this solar solution, and to schedule a site visit, kindly contact our representative.