Brief about the client:

Amit Cot Fiber is one of the fastest growing Manufacturing Industry. It is a Pvt Ltd company of cotton processing and oil mills in Vidarbha region of Maharashtra.

Project size: 600kw solar power plant

Client’s Name: Mr. Sumit Chaudhari

Address: N.H.6, Khamgaon-Jalgaon Road, Malkapur, Dist. Buldhana

Solar Panels Used:  Waaree Energies 540wp Mono + perc + half cut + bifacial

Inverters used: SolarEdge optimization inverter

Structure Type: Double column, ground mounted structure

Accessories Provided: Online Monitoring, Chemical Earthing and LA

Year of Installation: 2 March 2022

Yearly Electricity Generation: 9,00,000.00

Yearly Revenue Achieved: 90,00,000.00

 

Amit cot fiber is a cotton ginning industry situated in town of Malkapur (district Buldhana). It’s a completely integrated cotton ginning unit.

In 2019, due to high electricity bills, Mr. Chaudhari has decided to go green and to have a solar electricity solution for his industry. After detailed research and comparison, Chirayu power was awarded the prestigious 600kw solar power plant system.

The plant was supposed to be a ground mounted solar system. After inspection, chirayu power found that the type of soil is “Black cotton” which does not have load bearing capacity. Hence, chirayu power has decided to go with double column, heaviest solar structure for this installation.

For the first time, Waaree energies bifacial solar panels were used at an Industrial solution. Chirayu power was the first company to trust the technology and to use it for better generation. Also, Israel’s SolarEdge optimization inverters were used to maximize the electricity generation and to get module level generation and monitoring.

Today, this 600kw solar system is generating 9,60,000 units of electricity in a year. Mr. Chaudhari is extremely happy with the performance of solar plant and professionalism of chirayu power. Hence, Mr. Chaudhari has awarded an additional 600kw solar system extension to chirayu power.

Summary
600KW SOLAR POWER PLANT FOR AMIT COT FIBER AT MALKAPUR, DIST. BULDHANA
Article Name
600KW SOLAR POWER PLANT FOR AMIT COT FIBER AT MALKAPUR, DIST. BULDHANA
Description
“Amit Cot Fiber” is one of the fastest growing Manufacturing Industry. It is a Pvt Ltd company of cotton processing and oil mills in Vidarbha region of Maharashtra. Amit cot fiber is a cotton ginning industry situated in town of Malkapur (district Buldhana). It’s a completely integrated cotton ginning unit. In 2019, due to high electricity bills, Mr. Chaudhari has decided to go green and to have a solar electricity solution for his industry. After detailed research and comparison, Chirayu power was awarded the prestigious 600kw solar power plant system.
Author
Publisher Name
Chirayu Power
Publisher Logo