fbpx
  • Office timing: 10AM to 7PM (Except holidays)

80KW Solar Grid Tied Electricity Solution for Modern College, Pune

80KW SOLAR GRID TIED ELECTRICITY SOLUTION FOR MODERN COLLEGE PUNE

Brief about the client: Pune city is called the educational hub of Maharashtra. There are a lot of renowned educational institutes, out of which “The PES Modern College of Engineering” is one of the best institute.

The client has a RCC roof so after rigorous analysis and designs we have finalized the polycrystalline solar module technology along with Std inverter. It has 5 years warranty.

Address of the client: Shivajinagar, Pune, Maharashtra. 

Client’s representative: Mrs. Pallavi Jadhav.

Date of Commissioning of the solar system: 15/11/2019

Solar system capacity: 80kw Solar Grid Tied system with net-meter

Solar PV Modules used: Renewsys polycrystalline330Wp solar PV modules are been used for this solution.

Solar Inverter Technology:  Std Inverter technology is used for this project according to client’s requirement. It is cost-effective as well as with high productivity.

Lifetime remote monitoring solution is also provided to the client. Our team also checks the health of the solar system once every week so that our client gets the best solar experience.

We have also provided AC and DC protections like SPD’s, fuses, DC MCB, AC MCB, MCCB, single phasing preventer, IP 68 polycarbonate boxes etc.

Solar Panel Mounting Structure: We have provided a normal HDG structure for RCC roof. It is rust free structure and highly durable.

Earthing and Lighting arrestor: We have used a 50mm x 2-meter chemical earthing technology. Multiple earthing is used to get the best results.

For lighting arrestor, we have used Taiwan’s ESE lighting arrestor along with 2 pure copper lighting arrestors. The specialty of ESE arrestor is that it is an active type of lighting arrestor with a protection radius of 107 meters.

To connect the earthing to different electrical and electronic components, we have used hot-dip galvanized 25mm x 3mm earthing strip with 11000V insulators for thorough protection.

It’s been more than 1 year now and the solar system is working as expected. If someone wants to see any ideal industrial solar solutions in the district of Pune, then this 80KW solar grid-tied system is the best option.

For further details about this solar solution and site visit, kindly contact our representative. We will be happy to show you around.