Home Solar Maharashtra: MERC Draft Rules 2026 Explained

C
Chirayu Power
02 / POLICY & REGULATION
4 MIN READ
10 OCT 2026
Residential rooftop solar, MERC draft rules 2026

Planning solar for your home, flat or housing society? MERC has proposed new rules for rooftop solar. They are not final yet, but they can affect how much you save. Here is a simple guide.

Already have solar?

Earlier rules generally continue for your existing agreement. But if you expand your system or switch billing routes, the new rules can apply. Check your agreement and application dates before making changes.

What is “banking”?

Banking is not a physical battery. It is an electricity credit on your bill. You use solar at home, send the extra to the grid, and use the credits later. One unit means 1 kWh.

Up to 3 kW: credits last longer

If your total renewable capacity is 3 kW or less, annual banking stays. Credits last 12 months, with no time slots and no banking or standby fees. At year-end, unused units are bought at MERC’s solar-hour market-linked rate, not your retail electricity price.

Above 3 kW: credits reset monthly

Banking becomes monthly. If 80 units are left at month-end, they won’t carry forward. Renewable Energy Certificates may be available, but cash recovery is not guaranteed. So size your solar around your monthly use.

Total renewable sizeBankingTime slots
Up to 3 kWAnnualNone
3–10 kWMonthlyNone
10–100 kWMonthly4 per day

Larger society projects above 100 kW get even more daily slots. Batteries are not counted in your size.

Banking charges

Systems up to 10 kW pay no banking or standby fees. Above 10 kW, a size-based or unit-based charge is proposed, but rupee rates are not announced yet.

Does every home need a battery?

No. The proposed storage rule is only for new systems above 100 kW. A typical home system is well below that. Large society projects should check it.

Does the grid have space?

Solar capacity is shared across the local transformer or feeder, with a normal limit of 70%. This limit already existed in 2019. Your inverter output (AC) must also fit your approved electricity load.

No suitable roof? Try shared solar

Virtual net metering lets several households share one solar plant and get credits on their bills. Residential allocation is up to 3 kW or your sanctioned load, whichever is lower. The plant must be at least 100 kW, and participants must be in the same utility area and consumer category. It can’t be combined with net metering, net billing, on-site captive, battery storage or open access on the same connection. Network charges and losses apply.

Meters, fees and timelines

  • Meters: You pay for the net-meter replacement and the solar generation meter. Systems above 20 kW need a check meter.
  • Zero-export solar: Below 1 kW, no prior notice is needed. From 1 kW, notify the utility before installing.
  • Fees: LT pays Rs 500 for up to 20 kW, plus Rs 100 for each further 20 kW or part. HT pays Rs 5,000.
  • Arrears: Unpaid dues can block net metering or net billing.
  • Timeline: Feasibility in 15 days, approval in 7 working days, then testing and meter in 10 + 5 working days. Complete applications up to 10 kW skip feasibility. Install within 6 months of approval. If the utility is late, proposed compensation is Rs 500 per day.

Choose how your solar earns

  • Net metering: export extra units and adjust credits against grid use.
  • Net billing: sell surplus at the approved generic tariff.
  • Gross metering: sell all generation at a fixed rate.

Net billing and gross metering offer no banking.

Read the agreement first

Agreements run 20 years, with a 1-year lock-in and up to 2 route switches. Switching triggers the new rules, and old banked credits are not carried forward.

Before you take a quote

Choose for your bill, not just your roof size. A good quote should look at your last 12 bills and daytime use, inverter limit and roof potential, monthly surplus and time-slot use, and battery cost and usable capacity.

Have your say

Comments close on 12 October 2026 through MERC’s E-Public Consultation. Hard copies must arrive before 5 PM that day, and counter-comments are due by 15 October.

Chirayu Power can help you review your bill and plan the right solar size. Visit chirayupower.com.

Based on the MERC draft of 22 September 2026. Details may change.

Comments & Discussion

0

Enjoyed this article? Share your thoughts, ask a question, or join the conversation.

Comments are public as soon as you post them. Please don’t include phone numbers, email addresses or other personal details. For a quote or a project-specific question, contact our team privately.

0 / 1000 characters

No comments yet

Be the first to share your thoughts, engineering questions, or feedback on "Home Solar Maharashtra: MERC Draft Rules 2026 Explained"!