SR Cotton, Beed

Project Category: Textile SectorInstalled Capacity: 225 kW
Location: Beed, MaharashtraClient: Mr
Annual generationCO₂ offsetPeak Capacity
348k kWh / yr285 Tons / yr225 kW

Project Overview & Report

225 kW Solar Project SR Cotton Beed

Client: Mr. Naman Tayal (Owner, S R Cotton)

Location: Beed, Maharashtra

Project Capacity: 225 kW

Executed By: Chirayu Power Pvt. Ltd.

Project Overview

S R Cotton, a leading cotton processing facility in Beed, Maharashtra, wanted to reduce rising electricity costs and ensure long-term energy stability for its operations. With high daytime power consumption, switching to solar was the most efficient and sustainable choice.

Chirayu Power conducted a detailed load study, site survey, and structural assessment to design a highly optimized 225 kW rooftop solar system tailored for industrial energy demands.

Client Challenges

Before installation, S R Cotton faced:

Chirayu Power engineered a solution that maximised generation, reduced energy costs, and ensured long-term reliability.

Our Solution

545 Wp Mono PERC Half-Cut Panels (Tier 1 – Waaree Energies)

SolarEdge Optimiser-Based Inverter System

Strong & Durable Mounting Structure

Safety & Accessibility

High-Quality Electrical Components

Monitoring & Smart Integration

Metering, Liaisoning & Approvals

Why S R Cotton Chose Chirayu Power?

  • High electricity bills due to large machinery and processing equipment.
  • Seasonal peak loads, especially during processing cycles.
  • Limited roof space, requiring a dual-slope optimized design.
  • Need for a maintenance-friendly system due to continuous operations.
  • South Slope: Monofacial Panels
  • North Slope: Bifacial Panels This dual-configuration ensured maximum generation throughout the year.
  • World’s No.1 Optimisation Technology
  • 12-year inverter warranty
  • Every panel fitted with power optimizers for: Higher generation
  • Module-level monitoring
  • Safety shutdown
  • Better performance in partial shading
  • South Slope: Aluminium short rail monorail structure
  • North Slope: Heavy-duty GI structure elevated by 1 meter for better bifacial output
  • Designed for 150 km/hr wind speed
  • Installed on metal sheet roofing.
  • GI walkWay for safe movement over the rooftop
  • 24” galvanized safety railing
  • Dedicated inverter stand with protective canopy
  • Chemical earthing (copper bonded)
  • Pure copper lightning arrestors
  • Armoured AC/DC cables with perfect weather protection
  • IP65 rated JB, DCDB & ACDB with SPD, Isolators, MCBs, MCCBs
  • Live generation monitoring via mobile & desktop
  • Smart performance alerts
  • Real-time savings and unit-tracking dashboard
  • CT-operated generation meter
  • ABT-HT net meter (0.2s class)
  • Complete DISCOM/MSEDCL liaisoning handled by our team
  • Included all documentation and site inspections
  • Proven expertise in industrial rooftop solar installations
  • Customized dual-slope engineering to maximize energy generation
  • Use of premium Tier-1 solar components for long-term reliability
  • Transparent documentation, liaisoning & approval support
  • A strong, highly experienced technical team with extensive hands-on project expertise
  • Robust post-installation service network ensuring smooth and reliable system performance

Conclusion

The 225 kW solar project for S R Cotton Beed, showcases how even complex industrial rooftops can achieve maximum energy output with the right engineering approach. Despite the dual-slope structure and limited roof space, Chirayu Power Pvt. Ltd. executed the entire installation with precision — ensuring zero production downtime for the client.

Our focus on quality components, structural safety, and optimized power generation helped create a long-term, reliable energy solution tailored to S R Cotton’s operational requirements.

With every project, our mission remains unchanged: to deliver high-performance solar systems that reduce industrial energy costs and accelerate sustainability goals.

Performance Recap

For businesses planning their transition to solar energy, Chirayu Power Pvt. Ltd. is ready to support you with engineering excellence and end-to-end EPC expertise.

To explore how solar can benefit your industry or to schedule a site visit, contact our team today.

For complete project visuals and aerial views, you can watch the full drone video on our YouTube channel.

  • Expected Annual Generation: ~3.20 – 3.40 Lakh units/year
  • Estimated Annual Savings: ₹18 – ₹22 Lakh
  • Carbon Offset: Equivalent to 3,000+ trees saved annually