| Sr. No. | Publishing Authority | Category & Type | Subject / Title | Short Summary | Official Document |
|---|---|---|---|---|---|
| 1 | Grid Code & Transmission Connectivityregulation 16 Oct 2026 10 min read | GERC's 2026 BESS Regulations allow consumer and co-located storage with GEDA registration but bar standalone BESS from serving captive or third-party RE in Gujarat. | |||
| 2 | Open Access Solarcircular 13 Oct 2026 8 min read | From October 2026 MSEDCL requires NABL-tested AMISP smart meters for all existing HT and all new open access connections, with meter, testing and installation costs recovered from the OA consumer under the MERC MYT Schedule of Charges. | |||
| 3 | Renewable Purchase Obligations & RECorder 8 Oct 2026 9 min read | UPERC is moving defaulting RPO-obligated entities in UP toward Section 142 penalty proceedings and has ordered public disclosure of RPO compliance data. | |||
| 4 | Rooftop Solar & Distributed Generationdraft_regulation 22 Sept 2026 9 min read | MERC's Draft Rooftop RE Regulations, 2026 would require storage with every new rooftop or behind-the-meter system above 100 kW and move rooftop banking to capacity-based slots with banking and standby charges. | |||
| 5 | Forecasting, Scheduling & DSMdraft_regulation 22 Sept 2026 9 min read | MERC's draft FS Second Amendment, 2026 would move Maharashtra solar and wind settlement to Scheduled Generation by April 2028 at the latest, with deviation computed purely on schedule (X = 0) from April 2031. | |||
| 6 | Electricity Act Amendments & State Policiesdraft_regulation 22 Sept 2026 11 min read | MERC's Draft BESS Regulations, 2026 would give consumer-side, standalone and aggregated batteries a defined regulatory status in Maharashtra and exempt storage-only drawal from wheeling, demand charges and surcharges. | |||
| 7 | Renewable Purchase Obligations & RECdraft_regulation 22 Sept 2026 8 min read | MERC's draft RPO Second Amendment, 2026 would require obligated entities, including captive and open access users, to reach at least 65% RE by FY 2035-36 and would raise the storage obligation to 10%. | |||
| 8 | Open Access Solardraft_regulation 22 Sept 2026 9 min read | MERC's Draft DOA Regulations, 2026 would replace monthly ToD-slot banking with capacity-tiered banking of up to 24 slots a day, priced through new fixed and variable Banking and Standby Charges. | |||
| 9 | Rooftop Solar & Distributed Generationguidelines 8 Sept 2026 8 min read | Government of India establishes dedicated VGF grant support of up to ₹2.00 Crore for industrial solar thermal projects. | |||
| 10 | Electricity Act Amendments & State Policiesguidelines 4 Sept 2026 9 min read | The Energy Department confirms that every new RE project above 100 kW in Maharashtra, including open access supply, must reach COD together with co-located energy storage, while projects with in-principle connectivity before 1 April 2026 stay under the 2015/2020 policies. | |||
| 11 | Renewable Energy Tariffsorder 25 Aug 2026 9 min read | From 25 August 2026, KERC pays Rs. 3.11/unit (DCR) or Rs. 2.34/unit (non-DCR) for exported energy from non-domestic distributed solar, and 75% of that under group or virtual net metering. | |||
| 12 | Open Access Solaramendment 19 Aug 2026 10 min read | From 1 September 2026 Gujarat's GEOA banking charge falls to Rs. 1.00 per unit until March 2027, after which a data-driven annual methodology applies. | |||
| 13 | Rooftop Solar & Distributed Generationregulation 19 Aug 2026 9 min read | Karnataka now allows net metering for all consumer categories up to 1,000 kW (capped at sanctioned load), alongside net billing, gross, group, virtual and behind-the-meter options for distributed solar. | |||
| 14 | Renewable Purchase Obligations & RECamendment 7 Aug 2026 12 min read | Madhya Pradesh obligated entities must source 2.5% (FY 2026-27) rising to 4.0% (FY 2029-30) of energy as solar or wind with storage, counted within their RPO. | |||
| 15 | Grid Code & Transmission Connectivitydraft_regulation 23 Jul 2026 7 min read | UPERC's July 2026 draft Grid Code would replace the 2007 code with an IEGC 2023-aligned framework that covers captive plants and energy storage systems. |
MERC MSEDCL Tariff Review Order (Case No. 75 of 2025, 25 March 2026): ToD, Banking, Wheeling, CSS and Grid Support Charges for FY 2025-30
Key Highlights & Summary (6 Essential Points)
Clear, easy-to-understand breakdown of the document guidelines, numbers, and practical implications:
Summary prepared by Chirayu Power, not the government's wording. Refer to the official document for the exact text.
- 1
On 25 March 2026 MERC issued its post-remand review order in Case No. 75 of 2025, revising MSEDCL's MYT Order of 28 March 2025 (Case No. 217 of 2024).
- 2
Energy banked during solar hours (09:00-17:00) can now be drawn only in solar hours, effective from 1 July 2025.
- 3
The night ToD rebate was removed, and the solar-hour rebate is 15-25% while the peak slot (17:00-24:00) carries +20%.
- 4
HT industry wheeling is Rs 0.74/kVAh in FY 2025-26 and Rs 0.81/kVAh in FY 2026-27, and EHV consumers pay none.
- 5
Grid Support Charges of Rs 1.40/unit (HT) and Rs 1.88/unit (LT) apply from FY 2025-26 to net metering above 10 kW.
- 6
CSS is capped at 20% of ACoS, and no additional surcharge was approved for the fifth control period.