
Knowledge Center
| Sr. No. | Publishing Authority | Category & Type | Subject / Title | Short Summary | Official Document |
|---|---|---|---|---|---|
| 31 | Forecasting, Scheduling & DSMamendment 3 Oct 2025 10 min read | Madhya Pradesh now applies forecasting, scheduling and DSM to solar of 5 MW and above with storage and to stand-alone ESS, with separate metering and QCA bank guarantees. | |||
| 32 | Renewable Purchase Obligations & RECregulation 12 Aug 2025 8 min read | Gujarat's 2025 RPO Regulations bind open access and captive users to RE targets rising to 43.33% by FY 2029-30, plus a storage obligation of up to 3.5%. | |||
| 33 | Open Access Solarcircular 7 Aug 2025 7 min read | LT consumers taking green energy open access in MSEDCL areas must install AMISP-supplied four-quadrant smart LT-ToD main and check meters at their own cost under the MERC-approved Schedule of Charges. | |||
| 34 | Power Market Regulations & Tradingscheme 9 Jun 2025 7 min read | Government of India establishes dedicated ₹5,400 Crore grant support to jumpstart utility-scale battery storage. | |||
| 35 | Rooftop Solar & Distributed Generationamendment 3 Jun 2025 10 min read | The June 2025 Third Amendment ties UP's rooftop Solar Injection Compensation to the weighted average of recently adopted large-scale solar auction tariffs plus 25%. | |||
| 36 | Open Access Solarregulation 26 Mar 2025 10 min read | Karnataka's 2025 Open Access Regulations replace the struck-down GEOA framework, allowing 100 kW+ consumers open access with monthly banking at an 8% in-kind charge and exempting captive users from CSS and additional surcharge. | |||
| 37 | Rooftop Solar & Distributed Generationcircular 3 Mar 2025 9 min read | Since 4 March 2025 every non-subsidised LT rooftop solar application in MSEDCL areas is processed on the RTS Vendor Portal, with SDO-issued release orders and AMISP-installed net meters within 24-96 hours. | |||
| 38 | Electricity Act Amendments & State Policiescircular 28 Feb 2025 10 min read | Manufacturing units in 19 Vidarbha and Marathwada districts pay no electricity duty on grid or captive self-use power from 1 April 2024 to 31 March 2029, and MSEDCL circles now grant the waiver directly after site verification. | |||
| 39 | Grid Code & Transmission Connectivityadvisory 18 Feb 2025 8 min read | Mandatory guideline setting a 10% capacity, 2-hour duration storage benchmark for future solar tenders. | |||
| 40 | Renewable Energy Tariffsorder 30 Jan 2025 9 min read | MERC has extended its RE Tariff Regulations, 2019 to March 2030, so Maharashtra utility-scale solar tariffs keep coming from competitive bidding and only rooftop PV gets a generic tariff. | |||
| 41 | Renewable Purchase Obligations & RECamendment 21 Jan 2025 10 min read | Karnataka's RPO now follows the central non-fossil consumption trajectory, rising to 43.33% by 2029-30, and applies the same percentages to captive and open access consumers on their non-DISCOM consumption. | |||
| 42 | Rooftop Solar & Distributed Generationguidelines 7 Jan 2025 7 min read | Resolves a critical industry bottleneck: minor DC oversizing does not trigger load increase penalties. | |||
| 43 | Open Access Solaramendment 16 Dec 2024 9 min read | The December 2024 amendment opens green energy open access in UP to consumers of 100 kW and above, allows aggregation through a Lead GEOA Consumer and extends long-term open access up to 25 years. | |||
| 44 | Open Access Solarcircular 9 Sept 2024 9 min read | MSEDCL's Commercial Circular 346 puts green energy open access into operation for consumers of 100 kW and above, with 8% in-kind banking, lapse of unused banked energy, and SEM/ToD metering for consumers below 1 MW. | |||
| 45 | Rooftop Solar & Distributed Generationamendment 6 Sept 2024 10 min read | The 2024 Fourth Amendment standardised rooftop system strengthening charges above 6 kW and set fixed approval timelines from GEDA registration to commissioning in Gujarat. |