31
Madhya Pradesh Electricity Regulatory Commission (MPERC)
Madhya Pradesh
Forecasting, Scheduling & DSMamendment
3 Oct 2025
10 min read
Read Analytical Brief

Madhya Pradesh now applies forecasting, scheduling and DSM to solar of 5 MW and above with storage and to stand-alone ESS, with separate metering and QCA bank guarantees.

32
Gujarat Electricity Regulatory Commission (GERC)
Gujarat
Renewable Purchase Obligations & RECregulation
12 Aug 2025
8 min read
Read Analytical Brief

Gujarat's 2025 RPO Regulations bind open access and captive users to RE targets rising to 43.33% by FY 2029-30, plus a storage obligation of up to 3.5%.

33
Maharashtra State Electricity Distribution Co. Ltd. (MSEDCL)
MaharashtraMSEDCL Portal
Open Access Solarcircular
7 Aug 2025
7 min read
Read Analytical Brief

LT consumers taking green energy open access in MSEDCL areas must install AMISP-supplied four-quadrant smart LT-ToD main and check meters at their own cost under the MERC-approved Schedule of Charges.

34
Ministry of Power, Government of India (NRE Section)
Central / India
Power Market Regulations & Tradingscheme
9 Jun 2025
7 min read
Read Analytical Brief

Government of India establishes dedicated ₹5,400 Crore grant support to jumpstart utility-scale battery storage.

35
Uttar Pradesh Electricity Regulatory Commission (UPERC)
Uttar Pradesh
Rooftop Solar & Distributed Generationamendment
3 Jun 2025
10 min read
Read Analytical Brief

The June 2025 Third Amendment ties UP's rooftop Solar Injection Compensation to the weighted average of recently adopted large-scale solar auction tariffs plus 25%.

36
Karnataka Electricity Regulatory Commission (KERC)
Karnataka
Open Access Solarregulation
26 Mar 2025
10 min read
Read Analytical Brief

Karnataka's 2025 Open Access Regulations replace the struck-down GEOA framework, allowing 100 kW+ consumers open access with monthly banking at an 8% in-kind charge and exempting captive users from CSS and additional surcharge.

37
Maharashtra State Electricity Distribution Co. Ltd. (MSEDCL)
MaharashtraMSEDCL Portal
Rooftop Solar & Distributed Generationcircular
3 Mar 2025
9 min read
Read Analytical Brief

Since 4 March 2025 every non-subsidised LT rooftop solar application in MSEDCL areas is processed on the RTS Vendor Portal, with SDO-issued release orders and AMISP-installed net meters within 24-96 hours.

38
Industries, Energy, Labour and Mining Department, Government of Maharashtra (GoM); implemented by Maharashtra State Electricity Distribution Co. Ltd. (MSEDCL)
MaharashtraMSEDCL Portal
Electricity Act Amendments & State Policiescircular
28 Feb 2025
10 min read
Read Analytical Brief

Manufacturing units in 19 Vidarbha and Marathwada districts pay no electricity duty on grid or captive self-use power from 1 April 2024 to 31 March 2029, and MSEDCL circles now grant the waiver directly after site verification.

39
Central Electricity Authority (CEA), Ministry of Power
Central / India
Grid Code & Transmission Connectivityadvisory
18 Feb 2025
8 min read
Read Analytical Brief

Mandatory guideline setting a 10% capacity, 2-hour duration storage benchmark for future solar tenders.

40
Maharashtra Electricity Regulatory Commission (MERC)
Maharashtra
Renewable Energy Tariffsorder
30 Jan 2025
9 min read
Read Analytical Brief

MERC has extended its RE Tariff Regulations, 2019 to March 2030, so Maharashtra utility-scale solar tariffs keep coming from competitive bidding and only rooftop PV gets a generic tariff.

41
Karnataka Electricity Regulatory Commission (KERC)
Karnataka
Renewable Purchase Obligations & RECamendment
21 Jan 2025
10 min read
Read Analytical Brief

Karnataka's RPO now follows the central non-fossil consumption trajectory, rising to 43.33% by 2029-30, and applies the same percentages to captive and open access consumers on their non-DISCOM consumption.

42
Maharashtra State Electricity Distribution Co. Ltd. (MSEDCL)
MaharashtraMSEDCL Portal
Rooftop Solar & Distributed Generationguidelines
7 Jan 2025
7 min read
Read Analytical Brief

Resolves a critical industry bottleneck: minor DC oversizing does not trigger load increase penalties.

43
Uttar Pradesh Electricity Regulatory Commission (UPERC)
Uttar Pradesh
Open Access Solaramendment
16 Dec 2024
9 min read
Read Analytical Brief

The December 2024 amendment opens green energy open access in UP to consumers of 100 kW and above, allows aggregation through a Lead GEOA Consumer and extends long-term open access up to 25 years.

44
Maharashtra State Electricity Distribution Co. Ltd. (MSEDCL)
MaharashtraMSEDCL Portal
Open Access Solarcircular
9 Sept 2024
9 min read
Read Analytical Brief

MSEDCL's Commercial Circular 346 puts green energy open access into operation for consumers of 100 kW and above, with 8% in-kind banking, lapse of unused banked energy, and SEM/ToD metering for consumers below 1 MW.

45
Gujarat Electricity Regulatory Commission (GERC)
Gujarat
Rooftop Solar & Distributed Generationamendment
6 Sept 2024
10 min read
Read Analytical Brief

The 2024 Fourth Amendment standardised rooftop system strengthening charges above 6 kW and set fixed approval timelines from GEDA registration to commissioning in Gujarat.