Behind-the-Meter (BTM) industrial solar systems connect directly to your facility internal electrical distribution board on your side of the utility billing meter. Power generated by factory rooftop panels or ground-mounted arrays is consumed instantaneously by connected manufacturing machinery, process loads, and plant equipment. Because power never leaves your premises, BTM installations bypass state transmission grids entirely, avoiding wheeling charges, transmission losses, and open access regulatory surcharges.

Industrial shed rooftop integration with zero roof penetration.
Solar PV arrays installed on factory PEB sheds or RCC roofs feed clean power directly into your internal LT/HT switchboard. Solar electricity automatically satisfies real-time facility demand before drawing from the utility grid.
Manufacturing plants, warehouses, cold storages, and factories with shadow-free shed roofs.
Seam-clamp mounting preserves 100% shed waterproofing
Displaces peak utility energy units instantaneously
Lowers contract kVA maximum demand spikes
BTM installations deliver the fastest return on investment of any solar configuration by directly substituting retail HT utility tariffs.
Direct Retail Tariff Displacement
Every solar unit consumed on-site displaces your full retail tariff (₹8.50 - ₹11.50/unit) rather than a discounted off-site export rate.
No Wheeling or CSS Uncertainty
Completely free from transmission charges, cross-subsidy disputes, SLDC scheduling fees, and DISCOM open access connectivity delays.
Accelerated Depreciation
Claim 40% Year-1 tax depreciation write-offs under Section 32 of the Income Tax Act, accelerating capital payback to under 3.5 years.
| Parameter | Behind-the-Meter Solar (On-Site) | Open Access Solar (Off-Site) | Standard Grid Utility Supply |
|---|---|---|---|
| Grid Charges (Wheeling / CSS) | ₹0 (None applicable) | Applicable based on structure | Built into retail tariff |
| Transmission Losses | 0% (Generated at load) | 3% - 5% transmission losses | Transmission losses built in |
| Space Requirement | Factory roof or campus land | Zero on-site space required | Zero on-site space required |
| Approval Timeline | 15 - 30 days (DISCOM CEIG) | 45 - 90 days (STU / SLDC / MSEDCL) | Existing connection active |
| Effective Electricity Cost | ₹2.20 - ₹2.80 / unit (LCOE) | ₹4.50 - ₹6.50 / unit (landed) | ₹8.50 - ₹11.50 / unit (HT) |