Group Captive Solar: Shared Equity, High Savings, Zero Cross-Subsidy Surcharge

Group Captive Solar:Shared Equity, High Savings, Zero Cross-Subsidy Surcharge

Reviewed: August 2026

     

Group Captive solar enables multiple commercial and industrial power consumers to jointly build or invest in an off-site utility-scale solar park through a Special Purpose Vehicle (SPV). By collectively holding at least 26% equity and consuming at least 51% of generated power in proportion to equity shares, members secure complete exemption from the Cross-Subsidy Surcharge (CSS) and Additional Surcharge (AS) under the Electricity Act 2003.

26%
Collective Equity Pool
51%
Minimum Consumption
₹0 CSS
100% CSS Exemption
35-40%
Effective Tariff Savings
150 MW+
Ground-Mounted Track

     

Group captive SPV solar park infrastructure
STEP 01 — EQUITY FORMATION

Incorporation of generating Special Purpose Vehicle (SPV).

A dedicated generating company (SPV) is formed. Participating industrial consumers collectively hold at least 26% of the SPV equity capital in proportion to their contracted power off-take, with Chirayu Power and project partners holding the remaining equity.

BEST SUITED FOR

Medium-to-large consumers looking to pool demand and minimize individual balance sheet equity commitments.

01 — INCORPORATE

Special Purpose Vehicle formed for the solar asset

02 — EQUITY POOL

Industrial buyers jointly hold minimum 26% equity

03 — VOTING RIGHTS

Genuine equity with dividend rights fulfilling rules

    

Group Captive provides the cost advantages of large utility-scale solar farms combined with the regulatory exemptions of on-site captive solar plants.

01SURCHARGE WAIVER

100% Exemption from CSS

Waives the hefty Cross-Subsidy Surcharge (CSS) charged on standard third-party open access, saving ₹1.50 to ₹2.50 per unit on monthly electricity bills.

02SCALE ADVANTAGE

Utility-Scale Generation Efficiency

Benefit from lower CAPEX per MW, superior tracking technology, and specialized centralized maintenance of multi-MW ground-mounted solar parks.

03LOWER EQUITY

Fractional Capital Investment

Instead of funding an entire 10 MW solar park alone, each company funds only their proportionate slice of the 26% group equity requirement.

MetricGroup Captive SolarThird-Party Open Access PPAStandard Grid Utility Supply
Cross-Subsidy Surcharge (CSS)Exempt (₹0/unit)Payable (₹1.50 - ₹2.50/unit)Built into HT retail tariff
Additional Surcharge (AS)Exempt under valid captive statusPayable per tariff orderBuilt into retail tariff
Wheeling & Transmission FeePayable to STU / DISCOMPayable to STU / DISCOMIncluded in tariff
Capital RequirementFractional equity in 26% poolZero upfront capitalZero capital (pure tariff)
Effective Landed Cost₹4.50 - ₹5.80 / unit (typical)₹6.50 - ₹7.80 / unit (typical)₹8.50 - ₹11.50 / unit (HT)

Frequently Asked Questions

In a solar rooftop system, solar panels are installed on the roof of any residential, commercial, institutional, or industrial building. This can be of three primary types: (i) Grid Connected Solar Rooftop System (without battery storage), (ii) Solar Rooftop System with battery storage facility (Off-Grid), and (iii) Hybrid Solar Rooftop System (Grid Connected along with Battery Storage backup).
Showing 1–6 of 83 questions
…
Have more technical or commercial questions?Browse Complete FAQ Knowledge Center